Washington Court House Industrial Park

SiteOhio authenticated means construction ready day one.

Washington Court House Industrial Park, which has been deemed among Ohio’s top sites, has all utilities reaching to the park boundaries, all due diligence studies completed with clear findings, and access to a large regional labor force. Washington Court House Economic Development and the Dayton Development Coalition collaborated to inventory the site’s compelling features that make it ideal for business.

  • is rail served.
  • is within an hour drive of Columbus and Dayton.
  • has large excess water, sewer, and electric capacities.

Overview of Site

Site Address: Lowes Boulevard
City: Washington Court House
County: Fayette
Ownership: KDT Farms and Oak Tree Properties (under option by the community)
Min Size: 5 acres
Max Size: 112 acres (287 total)
Price Per Acre: $15,000 - $35,000/acre
Zoning: Industrial
Distance to four-lane highway or interstate: Adjacent
Rail Service: Yes

Utility Service

Utility capacities are subject to change over time.
Please contact the site representative for the most recent information.

Electric to Park Boundaries

Excess Electric Capacity: 10 MW
Distance to Substation: .5 miles
Type of Feed: Dual Feed - Single Substation

Natural Gas to Park Boundaries

Excess Gas Capacity: 10,000 MCF/month
Available Pressure: 40 PSI

Water to Park Boundaries

Excess Water Capacity: 1.3 MGD
Total Capacity of System: 1.77 MGD

Sewer to Park Boundaries

Excess Sewer Capacity: .7 MGD
Total Capacity of System: .74 MGD

Fiber/Telecom Service to Park Boundaries

Fiber/Telecom Service to Park Boundaries: Yes

Due Diligence Studies and Reports

Phase I Environmental Report: Yes
Geotechnical Study: Yes
Wetlands Delineation: Yes
Army Corps of Engineers Jurisdictional Determination: Yes
Phase I Cultural Resources Study: Yes
State Historic Preservation Office Concurrence: Yes
Endangered Species Analysis: Yes
U.S. Fish and Wildlife Service Concurrence: Yes

Site Utilities

All utilities are available on the site with adequate capacities and can be viewed in the interactive map below. Click on the utility options above the map to view the approximate location of each utility line: electric (red), water (blue), fiber (purple), gas (yellow), and sewer (green).

Electric
Water
Fiber
Gas
Sewer
Electric Water Fiber Gas Sewer Utility Map

For more information, view this site on our site selection tool or email us at SiteOhio@jobsohio.com.

Video Transcript

Hi everybody, I’m Jungle Jack Hanna, Director Emeritus of the Columbus Zoo and Aquarium. I’m really excited to tell you about a wonderful investment opportunity right here in Ohio.

This is the Washington Court House Industrial Park, a property that has been pre-vetted to guarantee speed, cost, and risk benefits for locating businesses. Conveniently located within one mile of US Route 35, this SiteOhio Authenticated property is in close proximity to both Columbus and Dayton, has access to a large regional population and labor force, and has access to a Class II rail line traversing the park. With multiple options for lot configuration and size, the park boasts 287 total construction ready acres, with a maximum contiguous lot size of 112 developable acres.

Washington Court House Industrial Park has all major utilities to the park boundaries with verified excess capacities, including an electric line, a natural gas line, a water line, and a sanitary sewer line. The site also offers fiber capabilities.

All due diligence studies have been completed on this property, and authorizing state and federal entities have reviewed and provided concurrence with the findings. This effort minimizes unknowns to alleviate business expenses, and offers a streamlined opportunity for development.

The property has also been evaluated for compatible surrounding uses, and is located in a mature industrial park with 21 existing tenants. To experience more Site Ohio Authenticated sites, please visit jobs-ohio.com/site-selection.